Delay Node

Pause execution for a configured duration before passing records downstream

Last updated 8 Oct 2026

The Delay node pauses execution for a fixed duration, then passes its input records downstream unchanged. The wait is durable — it is implemented with Inngest's step.sleep, so the run resumes correctly even across worker restarts.

When to Use

Use Delay to introduce a wait period between automation steps — for example, waiting between campaign message sends, pausing before a follow-up action, or spacing out downstream calls.

Configuration

FieldTypeDescription
durationnumberDelay length, expressed in unit. Must be greater than 0. Required
unitseconds | minutes | hours | daysTime unit for duration. Required

Example

Wait 2 hours between processing batches:

duration: 2
unit: hours

Notes

  • The delay is a fixed duration set in the node config; it is not read from record fields.
  • Input records are passed through to the output unchanged.
  • The total delay is capped at a maximum duration — values above the cap are rejected at validation.
  • For waits that depend on an external job completing, use Poll instead.